Capture the site. Review it interactively. Model the systems you need.
Capture what is visible at each construction stage, compare it over time, and give authorized team members a shared visual reference.



Open a link. Click the floor plan. Go to the exact area.
Our proposal specifies the rooms, trade systems, capture dates, access permissions and file formats. The standard complete-program deliverables are designed for field teams, project managers and property owners.
Interactive 3D walkthrough
Use a browser-based tour to move through captured areas, revisit open walls and inspect visible installed conditions from your desk.
Top-down 2D floor plan included
A navigable floor-plan overview links to available scan viewpoints. Click a room or point to open the corresponding captured area.
Documented MEP rough-in
Record accessible pipes, ducts, conduit, penetrations, valves and equipment before drywall or ceilings conceal them.
Time-stamped site and progress imagery
Aerial overviews and selected repeat views help contractors, owners and investors compare visible progress across visits.
Organized handoff package
An organized handoff by area, trade and capture date. Compatible point-cloud exports and CAD/BIM files are specified in the proposal, including software version and model scope.
CAD / BIM modeling by defined scope
Where required, separately scoped CAD drawings or professionally modeled BIM/Revit deliverables can be produced from suitable captured data, with agreed disciplines, level of development, coordinate requirements and verification.
Owner and trade access
General contractors can coordinate documentation across mechanical, electrical, plumbing and other trades instead of commissioning disconnected records.
Record the critical moments from before work starts to finished space.
Schedule only the milestones that fit the job. Repeated visits to the same project can be priced progressively lower, when the capture scope remains comparable.
Preconstruction baseline
Existing conditions, visible site features, aerial overview and an initial floor-plan reference before work begins.
Post-demolition
Document exposed conditions and changes after demolition, before replacement systems or new assemblies conceal them.
Pre-cover / as-built visual record
Capture exposed rough-in and installed MEP conditions before drywall, ceilings or finishes close them in.
Finished-product closeout
Capture completed spaces and link the finished visual tour to earlier records for future maintenance reference.
A three-visit program can combine or omit a milestone as appropriate. “As-built visual record” means visible conditions captured on the visit date—not a certified survey or engineering verification.
Point, click, and find the relevant location.
A simple illustration of how an interactive tour and a navigable 2D floor-plan reference work together.
ILLUSTRATIVE PREVIEWClick a location on the sample plan
Choose a marked area to see the matching visual-record description.
This is an interactive illustration, not a customer scan or a working Realsee tour. Actual client tours use captured image and scan data, subject to agreed coverage and hosting.
Square-footage-based proposals. Lower rates on repeat visits.
Not every site needs the same scanning density, number of floors, access setup, or CAD outputs. We quote the actual work rather than advertise a misleading one-size-fits-all price.
Single project / single deployment
- Measured by documented square footage and access complexity
- Minimum deployment / mobilization fee may apply
- Define 2D floor plan and interactive 3D tour coverage up front
- CAD/BIM modeling priced by disciplines, level of development and deliverable format
Full 3- or 4-visit documentation program
- First visit establishes the project baseline and setup
- Each comparable subsequent visit priced below the previous visit
- Multi-building, multi-project and multi-trade discount opportunities
- Fixed scope and delivery schedule defined in your written proposal
Useful long after the walls close.
General contractors
One coordinated record across trades, dates and phases. Less time hunting for old photos or trying to identify who captured which area.
Mechanical, electrical & plumbing trades
Revisit visible installed runs and equipment locations to support coordination, takeoffs and later field questions.
Owners, developers & facility teams
Keep a dated visual record for turnover, maintenance planning, future renovations and investor or stakeholder progress reviews.
Questions a project manager will ask
Can we open the documentation remotely?
Interactive tours can be viewed through a shared online link when the hosting and access arrangements are included in the proposal. Export files and access permissions are defined before capture.
Is the 2D floor plan included?
Yes, a top-down navigable floor-plan overview is included in the proposed complete documentation package. Drafted, dimensioned CAD drawings or stamped plans are separate deliverables.
Can you provide CAD/BIM or Revit models?
Yes, CAD/BIM deliverables can be included as a separately specified service when the required modeling expertise and workflow are confirmed. Capture and modeling are different tasks. Before quoting, we establish modeled disciplines, level of development, model accuracy/verification expectations, coordinate system, required files (such as RVT, IFC or DWG), software version and delivery schedule. We do not promise engineering-certified models or fabrication-ready accuracy without the appropriate validation and professional scope.
Can you document all MEP trades on one visit?
Yes, visible and safely accessible mechanical, electrical and plumbing systems can be captured together, subject to agreed coverage and site access.
Will the scans locate pipes or wires behind completed walls?
No. The service records visible conditions at the time of capture. It is not subsurface detection or a guarantee that concealed work can be located without other verification.
Will the images and scans become engineering-verified as-built drawings?
No. The visual record supports field review. CAD/BIM modeling and its verification require a defined scope; survey-grade accuracy, engineering certification and signed drawings require the appropriate qualified professionals.
Safety & Accountability. Happy Contractors, LLC is a veteran-owned startup led by a retired police officer, FAA Part 107-certificated drone pilot and CHST-certified construction safety professional. We do not claim prior MEP project experience that has not been established. Field capture is planned around safe site access and permission from the contractor or property owner.
Give us the building size, schedule and scope.
We’ll define visit milestones, interactive 3D/2D deliverables, CAD/BIM model requirements, and site-specific pricing in a written proposal. We also welcome input from construction and MEP professionals as we develop these services.
253-888-3432